Mirvac Office & Industrial
  • Tenants
  • Contractors
  • Contractors

Money Mindset and Goal Setting

  • Money Mindset and Goal Setting

Contractor Registrations and Inductions

  • New Contractor Registrations
  • Existing Contractors

Resources

  • Mirvac Contractor Management System - Letter
  • Mirvac Contractor Management User Guide
  • Organisation Safety Statement
  • SWMS Template
  • SWMS - JSEA Requirements Checklist
  • Safety Management Plan template
  • Safety Management Plan Requirements Checklist

Policies

  • Alcohol and Other Drugs Policy
  • Health Safety Environment Policy

Mirvac Minimum Requirements

Critical Focus Area 1 - Fall Prevention

  • Work at Height MMR
  • Penetration, Riser & Shaft Management
  • Work with Tilt-up or Pre-Cast Concrete

Critical Focus Area 2 - Site Establishment & Logistics

  • Heavy Vehicle Management MMR
  • Site Establishment
  • Temporary Works - Design and Installation
  • Traffic Management

Critical Focus Area 3 - Civil Works & Groundworks

  • Coring, Boring and Concrete Cutting
  • Excavation and Trenching
  • Plant, Equipment and Tools

Critical Focus Area 4 - Cranes & Materials Handling

  • Cranes and Lifting

Critical Focus Area 5 - Electrical Safety

  • Isolation Lock Out Tag Out
  • Working with Electricity
  • Working with Electricity MMR Reference Document
  • Working with Services

Critical Focus Area 6 - Worker Health & Welfare

  • Asbestos Management
  • Confined Spaces Entry
  • Fitness for Work
  • Respirable Crystalline Silica MMR
  • Hazardous Manual Tasks
  • Occupational Exposures

Critical Focus Area 7 - Emergency Procedures

  • Emergency Preparedness and Response
  • Hot Work

Critical Focus Area 8 - Sustainability & Environment

  • Environmental Management

Standard Terms and Conditions

  • Work Order Internet Terms and Conditions

Permits

  • Building Maintenance Unit (BMU) Permit
  • Concrete Pumping Permit
  • Confined Space Entry Permit
  • Coring Chasing Concrete Cutting Permit
  • Elevated Work Platform EWP Permit
  • Energisation Commissioning Permit
  • Essential Fire Services Isolation Permit and Impairment Notice
  • Excavation Piling Boring Trenching Permit
  • Hot Work Permit
  • Industrial Rope Access Permit
  • Isolation Demolition Decommissioning Permit
  • Mobile Crane Permit
  • Roof Access Permit
  • Screen Lifting Permit
  • Temporary Works Permit
  • Tower Crane Erection Climbing Dismantle Permit
  • Unprotected Edge Access Permit

Videos

  • R U OK?
  • TLC

Mirvac Tenant Liaison Centre

1800 134 166
  • Tenants
  • Contractors

© Mirvac Group. All rights reserved.

  • Privacy Policy
  • Disclaimer
  • Tenant Liaison Centre